homeservicesmarketsprojectscertificationcontact
Toyota Office Campus-Texas                   Contract Type:Negotiated ($12.9 million)

 

 

 

 

 

Project included new office building and manufacturing plant on Toyota Tundra campus.

  • Submitted change orders and pay application to owner.
  • Detailed estimating, buy-out, wrote and issued contracts.
  • Reviewed design and establish design document release dates.

Alltel Stadium Renovation Project - Florida             Contract Type: Negotiated Bid ($40 million)

 

 

 

 

 

Renovation of the NFL’S Jacksonville Jaguars Alltel Stadium south end zone for Super bowl XXXIX; featuring the new Bud Zone and Terrace Club Suite which included terrazzo flooring, radius columns, the hull of a speed boat, wind sails, and other high end features.

  • Entirely responsible for the design and construction of the south end zone field tunnel (drilled piers).
  • Buy-out of decorative hand railing and protective glass railing.
  • Quality assurance – rebar inspection and waterproofing inspection.
  • Reviewing all rebar shop drawings.
  • Ordering and tracking all structural steel for the entire project.
  • Project close-out (3000 item punch list).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pepsi -Tropicana Office Renovation - California                     Contract Type: GMP ($17 million)

 

 

 

 

 

Project included new tilt-up concrete for office building and the renovation of an existing warehouse to install a 200k sf. cooler for Pepsi / Tropicana. This project also included an ammonia refrigeration system, built up flooring systems and CMU machine room with blowout panels.

  • Reviewed seismic calculations and design drawings.
  • Managed design team.
  • Detailed estimating.
  • Budget set up and scope buy-out.
  • Wrote contracts, major purchase orders.
  • Approved subcontractor pay applications and misc. invoices.

General Electric Learning Center – Ohio            Contract Type: Negotiated Bid ($17 million)

 

 

 

 

 

Award winning state of the art project for General Electric; project included a curtain wall system, 350 seat auditorium, stone hard flooring system, marlite wood paneling, several individual learning class rooms (overlooking auditorium), electronic information display board, new cafeteria and kitchen.

  • Tracking delivery dates for all major equipment.
  • Creating templates for whether delays and loss time accidents and safety infractions.
  • Project close out (punch list items and as-build drawings and final waiver).
  • Owner’s training / Operation and Maintenance manuals submission.

 

toyota toyotatoyota toyota toyota

Alcatel Office building -New York          Contract Type: Hard Bid ($14 million project)

 

 

 

 

 

Tilt up concrete office structure 25,000 SF.

  • Tracking delivery dates for all major equipment.
  • Creating templates for whether delays and loss time accidents and safety infractions.
  • Project close out (punch list items and as-build drawings and final waiver).
  • Owner’s training / Operation and Maintenance manuals submission.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NYC High Schools                            New York, New York

 

 

 

 

 

Project Engineer New York City School Const. Authority                                                 

  • Produce construction documents.
  • Assisted engineers with AutoCAD technical problems.
  • As field Engineer, conducted take offs attended meetings, composed meeting minutes and processed submittals.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Copyright 2011 BACConsulting LLC All rights reserved Webmaster:www.mngdesigns.com